The construction sector is one of the active sectors in Turkey, and its importance is increasing daily due to the supply of 150 sub-sectors related to the construction industry such as cement, ceramics, wood, glass and installation industry. We are glad and proud that we are a company that plans to create positive values in all circumstances and conditions, aiming to offer unparalleled projects.
Recognizing that the projects we have completed for construction, restoration and tourism are not only successful products for us, but also a successful guide to making our durability and credibility the basis of our quality concept. In the projects that we adopt, we apply from the tender stage to the acceptance stage the quality system of ISO standards. We plan for all operations that ensure the implementation of all activities that are suitable to the conditions and standards in all projects in a manner that suits the time, production and rationality plan. In every project we have, we have the same enthusiasm and desire to reach the best.
The original principles of our company are to update our experience and accumulation of information that protect our right and to take care of the interests of the employer and customer at the highest levels, in a manner appropriate to the concepts of construction and advanced technology without compromising on the level of quality and honesty , In order to achieve quality, continuous development and the establishment of complete buildings suitable for relevant laws and regulations.
Based on the principle of everything for the sake of man, Our main mission, which we are proud of is to serve as a model for all companies.
Residential buildings, industrial buildings , apartments and villas, offices and hotels, supermarkets, purification plants, hospitals, restoration, schools, road and asphalt works, bridges, irrigation channels, fishermen's places, sewerage, transportation lines , natural gas extensions and transformation works, all types of buildings, infrastructure and superstructures, construction work and commitments.
Our company has adopted the principle of employing qualified and competent workers in contracting and when needed, in addition to qualified workers in its structure. With the exception of administrative staff , the specializations and numbers of workers in our group of companies, whose numbers different according to the projects under implementation, are as follows:
Architect engineer | 2 |
Civil engineer | 4 |
Electrical engineer | 2 |
Mechanical engineer | 2 |
Map engineer | 1 |
Financial adviser | 1 |
Legal adviser | 1 |
Planning officer | 1 |
sales | 2 |
Internal security specialist | 1 |
Crane (capolian) | 2 |
Elevator is run from the ground | 2 |
Complete tunnel template system | 1 |
Half tunnel template system | 1 |
Asphalt distributor truck (DODGE) | 1 |
Passengers cars | 8 |
container | 7 |
Vibrator(COMBIHAMMER TE 76 230V) | 3 |
Shoulder vibrator (DYNAPACRACOON) | 2 |
Heater | 1 |
Heater vibrator | 2 |
Vibrator height 38 m.m | 2 |
Vibrator glasser (DTNAPAC 42V) | 2 |
Smurf one and ahalf ton (movement beaton holder) | 4 |
Water tank polyethylene 5 tons | 2 |
Water tank polyethylene 10 tons | 2 |
Water tank polyethylene 15 tons | 2 |
Telescopic coloumns,steel doors, Chisan bending machine | 5 |
Iron cutting scissors 36 m.m | 4 |
Iron cutting scissors 42 m.m | 4 |
Breaker machine (BREAKER TE-AVR230V) | 2 |
Breaker machine (BREAKER TE – AVR230V) | 2 |
Drilling machine (COMBIHAMMER TE 76) | 2 |
Packet amplifier (ETNA PACKET HIDROFOR SOH) | 2 |
Benzene galvanizer machine | 2 |
Cutting handles machine | 2 |
Electic crusher 50 m.m | 2 |
Palm stone cutting machine | 1 |
Stone cutting machine | 3 |
5 kv generator | 2 |
Cover(10*5 m) with pashbuga insulater | 5 |
Cover (14*7 m) with pashbuga insulater | 4 |
Tunnel template | 250 square meters |
Bulldozer (KOMATSU D85) 2008 model | 1 |
Crawler excavator (JCB PC-200-8) 2006 model | 1 |
Crawler excavator (KOMATSU PC-400-8) 1994 model | 2 |
اAsphalt cylinder (BOMAG 120) 1999 model | 1 |
Crawler finisher (DYNAPAC 15000K) 1991 model | 1 |
AXA generator (200 kva) 2009 model | 2 |
AXA generator (200 kva) 2008 model | 1 |
(Bathroom – banyo) container | 4 |
Office container | 400 square meters |
Truck with retarder | 6 |
1
The establishment of the Kibatash Dolayuba gym, which can accommodate up to 500 people.
Value of the agreement | 450.000+ VAT |
Total profit value | 492.000+ VAT |
Work starting date | 26.04.2007 |
Work finishing date | 16.05.2007 |
2
Kibatash Crescent Residential Complex in Tuzla Shefa. Building a structure of 576 apartments with an area of 75 square meters + 192 apartments with an area of 95 square meters
Value of the agreement | 14.545.000+ VAT |
Total profit value | 15.654.000+ VAT |
Work starting date | 01.05.2006 |
Work finishing date | 31.07.2007 |
3
Kipatash Crescent residential complexes in Ma'amar Sinan in Tuzla The construction of 528 residential apartments with an area of 75 square meters in the form of tunnel molds.
Value of the agreement | 1.250.000+ VAT |
Total profit value | 1.325.000+ VAT |
Work starting date | 26.04.2007 |
Work finishing date | 28.08.2007 |
4
Kipatash Pashak Residential Complex in Arnaout Cui Building 285 residential apartments with an area of 75 meters + 265 apartments with an area of 150 square meters in the form of turn key.
Value of the agreement | 12.796.000+ VAT |
Total profit value | 12.796.000+ VAT |
Work starting date | 16.05.2007 |
Work finishing date | 31.11.2009 |
5
Kipatash Kiappashi Residential Complexes
The construction of the structure of 3 blocks consisting of 180 apartments with an area of 115 square meters + 265 apartments with an area of 150 square meters in the form of tunnel molds.
Value of the agreement | 1.200.000+ VAT |
Total profit value | 1.200.000+ VAT |
Work starting date | 03.03.2008 |
Work finishing date | 31.12.2008 |
6
Buyuk Chekmja - Tabajik Collective Buildings of Kiptash The construction of the structure of 3 blocks consisting of 180 apartments with an area of 115 square meters + 265 apartments with an area of 150 square meters in the form of tunnel molds.
Value of the agreement | 600.000+ VAT |
Total profit value | 600.000+ VAT |
Work starting date | 17.03.2008 |
Work finishing date | 10.04.2008 |
7
Yeshele Construction – Esenyurt Inovia / Phase 1
The construction of two Blocks (b4 - b5) consisting of 306 apartments in the form of turnkey
Value of the agreement | 23.250.000+ VAT |
Total profit value | 23.250.000+ VAT |
Work starting date | 24.06.2008 |
Work finishing date | 30.08.2009 |
8
Yeshele Construction – Esenyurt Inovia / Phase 1
Construction Block (b6) consisting of 154 apartments in the form of turnkey.
Value of the agreement | 13.850.000+ VAT |
Total profit value | 13.850.000+ VAT |
Work starting date | 10.08.2008 |
Work finishing date | 30.08.2009 |
9
Biash Residential Complex - Belek Dozo
The construction of two Blocks (b4 - b5) consisting of 160 apartments of 99 square meters + 40 apartments of 130 square meters in the form of turnkey.
Value of the agreement | 15.196.000+ VAT |
Total profit value | 15.196.000+ VAT |
Work starting date | 20.08.2008 |
Work finishing date | 20.06.2010 |
10
Construction of the Pashak Residential Complex - Phase 2 - Second Area Infrastructure and environmental regulation of KEPTASH
The construction of 8 blocks of 480 apartments with 75 square meters in the form of turnkey.
Value of the agreement | 24.500.000+ VAT |
Total profit value | 24.500.000+ VAT |
Work starting date | 14.05.2008 |
Work finishing date | 19.11.2010 |